| 108 MW CPP 2 x 160 TPH CFBC BOILER | |
|---|---|
| Client: | THERMAX LTD., BOILER & HEATER DIVISION |
| End User: | SHRI GIRIJA ALLOY & POWER (I) LTD. |
| Scope: | Complete Plant Basic & Detail Design Engineering |
Category Archives: Domestic Projects
Domestic 30
| 65 KLPD MOLASSES BASED DISTILLERY | |
|---|---|
| Client: | PRAJ INDUSTRIES LTD. |
| End User: | M/S INDIAN SUGAR MANUFACTURING COMPANY LTD. |
| Scope: | Piping Design & detail engineering |
Domestic 29
| 1×120 MW CAPTIVE POWER PLANT | |
|---|---|
| Client: | THERMAX LTD. |
| End User: | RASHTRIYA ISPAT NIGAM LTD., VISAKHAPATNAM STEEL PLANT |
| Scope: | Design & Detail Engineering of Boiler & TG House |
Domestic 28
| 70 TPH FLUE GAS STEAM GENERATOR | |
|---|---|
| Client: | THERMAX LTD., BOILER & HEATER DIVISION |
| End User: | M/S-TECHNIP A/C ALGIRES REFINERY. ALGERIA |
| Scope: | Boiler Area Piping Design & Detail engineering. |